Starting a building project in Ghana? Whether you’re putting up a home, shop, or commercial property, the first thing you need is a building permit. It’s not just paperwork; it’s a legal must-have. Without it, your project can be stopped, fined, or even demolished.
But don’t worry. The construction approval process in Ghana isn’t as complicated as it seems, especially when you understand the steps. This guide will walk you through the permit process, step by step.
Let’s break it down.
Why Do You Need a Building Permit in Ghana?
Just like everywhere else in the world, a building permit in Ghana is an official document from your local assembly. It shows that your building plans follow the right safety rules, zoning laws, and environmental standards.
You need it for residential buildings, commercial buildings, renovations or extensions, and even when you want to convert buildings for different uses.
While skipping the permit might save time now, it can cost you later. You could face legal trouble or be forced to pull down the whole building.
If you’re a developer, check out these top real estate amenities that buyers are looking for in Ghana to raise your project’s market value.
Who Gives a Building Permit?
Building permits are issued by your local District, Municipal, or Metropolitan Assembly. If your project is in Accra, for example, you’ll apply through the Accra Metropolitan Assembly or the appropriate sub-metro.
Larger or special projects may also need extra clearance from the Town and Country Planning Department, the Environmental Protection Agency (EPA), and the Lands Commission (for site plan verification).
The Permit Application Process: Step-by-Step
1. Get Your Land Documents in Order
Before you apply, you’ll need a Site Plan, which must be approved by the Land Commission’s Survey and Mapping Division, and a Land Title Certificate or Indenture showing ownership or lease rights. You must also present a Land Search Report from the Lands Commission.
Your land must be properly registered because if there’s a dispute, your permit won’t be approved.
2. Hire a Professional to Draw Your Building Plan
You’ll need a licensed architect or draughtsman to prepare your building drawings. These include floor plans, elevations (views from the front, back, and sides), sections (cut-through views), and site layout (how your building fits on the land).
Make sure your architect understands developer permits in Ghana and follows local building codes.
3. Submit the application
Go to your local assembly’s Works Department or Physical Planning Department and submit: the application form, which you’ll fill in the office, five (5) copies of all building drawings, and your land documents (site plan, indenture/title, search report).
You’ll also have to provide proof of identity (national ID or passport) and a surveyor’s report (if needed). Just know you’ll pay a processing fee based on your project size.
4. Site Inspection by the Assembly
After submitting, the assembly will send a team to visit your land. They’ll check the boundaries, your project’s zoning compatibility, whether it’s residential or commercial, and the possible setbacks from roads or drains. They’ll also check for nearby structures or risks.
This inspection helps confirm that your project matches the area’s development plan.
5. Technical Review of Your Plans
Your building drawings will be reviewed by a Technical Committee made up of engineers, architects, planners, and fire and environmental officers.
They check if your plans follow local and national building codes in Ghana. They’ll look at safety, drainage, fire exits, structure, and how the building affects the area.
6. Permit Approval and Collection
If everything is in order, you’ll receive your Building Permit Certificate, usually within one to three months. For small residential projects, it could be faster. For larger projects, it might take longer.
You’ll also be given a Permit Number and asked to display a signboard showing your permit status during construction.
How Long is a Building Permit Valid?
A building permit in Ghana is usually valid for five (5) years. If you don’t start building within that time, you’ll need to renew it. Some assemblies allow extensions, but you must apply before it expire.
Are you thinking about investing in commercial real estate in Ghana? This article explores the key considerations you need to explore before making a decision. Read on to avoid any pitfalls.
What Happens if You Don’t Get a Building Permit?
Building without a permit is risky. You could face stop-work orders, fines, legal action, or demolition.
Some developers try to bypass the construction approval process in Ghana, but it almost always ends badly. Buyers and banks also ask for permits before doing business with you.
Tips to make the process smoother
- Start early. Don’t wait until the last minute.
- Work with registered professionals. Please avoid shortcuts.
- Visit the assembly often and follow up politely.
- You should keep copies of everything, from site plans to receipts.
- And ask questions. Every district may have slight differences.
Common Mistakes to Avoid
Don’t start construction without a valid permit certificate in hand, site inspection clearance (if applicable), and clear zoning confirmation for your project type.
Ensure not to fall victim to mistakes such as building on unregistered land, submitting incomplete documents, or using unapproved building designs.
Conclusion
Getting a building permit in Ghana isn’t just a box to tick; it’s a smart and necessary step. It protects your investment, ensures safety, and avoids legal problems.
The developer permits in Ghana may seem like a lot of work at first, but once you understand the process, it becomes easier. And if you’re serious about real estate or construction, it’s worth doing it right from the start.